When Do I Need an R&D Asbestos Survey?

Before any refurbishment, renovation, building or demolition work begins on a building constructed before 2000, a Refurbishment or Demolition Asbestos Survey is required, as set out in HSG264 Asbestos: The Survey Guide.

The survey covers the area where the work is planned and must be completed before work starts. Plan it in good time: if asbestos-containing materials are found that need to be removed, the removal of certain materials must be notified to the Health & Safety Executive 14 days before removal begins, which can add time to your programme.

Our South Wales team carries out R&D surveys across Cardiff, Newport, Swansea, Bridgend and the wider region.

20,000+

Surveys Completed

What Is a Refurbishment & Demolition Survey?

An asbestos refurbishment & demolition survey is conducted to locate, identify and assess the condition of asbestos-containing materials (ACMs) in a building, or part of a building, that is going to be renovated or demolished.

It is significantly more intrusive than a management survey. Our qualified surveyors visually identify suspect materials and use destructive survey techniques to reach materials that may be hidden in the fabric of the building. Samples are taken safely and analysed in our UKAS accredited laboratory to confirm whether asbestos is present.

The aim is to ensure the safety of everyone carrying out the work and to comply with the Control of Asbestos Regulations 2012.

31153-92

How Is an R&D Survey Different from a Management Survey?

Management Survey

For buildings in normal use. Far less intrusive. Locates and assesses asbestos that could be disturbed during occupancy and routine maintenance, and recommends how it should be managed.

Refurbishment & Demolition Survey

For planned works. Fully intrusive and destructive within the area of work. Locates asbestos in the fabric of the building so it can be dealt with before work starts.

Where a management survey hasn’t been intrusive in an area that will be disturbed, a localised refurbishment survey will be needed. Find out about Management Surveys.

NFP_7211CS142

R&D Surveys for Projects Across South Wales

We support refurbishment and demolition projects of every size across the region, including:

  • Office reconfigurations and commercial fit-outs
  • Factory, plant and warehouse upgrades on industrial estates
  • School and college refurbishment programmes
  • Healthcare and public-sector building works
  • Housing refurbishment and void works
  • Redevelopment and change-of-use projects
  • Partial and full demolition

Read more in our articles on refurbishment projects in Bridgend and asbestos surveys for manufacturing businesses.

Who We Support in South Wales

Principal Contractors

Surveys to inform your construction phase plan.

Construction Companies

Pre-works surveys for refurbishment and demolition packages.

Property Developers

Surveys ahead of redevelopment and change of use.

Facilities Managers

Localised R&D surveys before alterations and upgrades.

Commercial Landlords

Surveys before tenant fit-outs and strip-outs.

Schools & Education Estates

Surveys ahead of holiday refurbishment works.

Healthcare & Local Authorities

Surveys for public-sector building works.

Industrial & Manufacturing

Surveys before plant, roof and building upgrades.

What Happens After the Survey?

You receive a clear report identifying the location, extent and type of any asbestos-containing materials in the survey area. Where asbestos needs to be removed before work proceeds, the recommendations will state whether removal must be undertaken by a Licensed Asbestos Removal Contractor (LARC).

Once licensed removal is complete, our UKAS accredited analysts can carry out 4 Stage Clearances and air monitoring so the area can be safely handed back.

Asbestos air monitoring after removal works

The HSE strongly recommends the use of accredited or certificated surveyors for asbestos surveys. The duty holder should not appoint or instruct an independent surveyor to carry out a survey unless the surveyor is competent.

HSG264 Asbestos: The Survey Guide

The Core Surveys team

Why Choose Core Surveys for R&D Surveys in South Wales?

  • UKAS accredited to ISO/IEC 17020 for Refurbishment & Demolition Surveys
  • Surveyors holding the BOHS P402 as a minimum – CSCS carded, DBS checked and trained in working at height, lone working and confined spaces
  • In-house UKAS accredited laboratory (ISO/IEC 17025) for sample analysis
  • Air monitoring and 4 Stage Clearances available from the same team
  • A South Wales office in Treforest, supporting projects across the region
  • Established in 2004, working with contractors, developers and estates of every size

You May Also Need

Management Surveys in South Wales

Management Surveys

For the parts of the building that remain in normal use during and after your project.

Reinspection Surveys in South Wales

Reinspection Surveys

Keep your asbestos register current for any materials that remain in place after the works.

Asbestos Air Monitoring in South Wales

Asbestos Air Monitoring

Leak and background monitoring during removal, and 4 Stage Clearances before reoccupation.

R&D Asbestos Surveys Across South Wales

Supporting refurbishment and demolition projects throughout South Wales from our Treforest office – here are just some of the areas we cover.

Asbestos surveys in Cardiff

Cardiff

Asbestos surveys, reinspections and air monitoring for offices, retail, public buildings and homes across the capital.

Asbestos surveys in Newport

Newport

Supporting commercial, industrial and residential properties across Newport and the surrounding area.

Asbestos surveys in Swansea

Swansea

Surveys and air monitoring for businesses, estates and homeowners throughout Swansea and the west of the region.

Asbestos surveys in Bridgend

Bridgend

Management and refurbishment surveys for Bridgend’s manufacturing sites, industrial estates and commercial premises.

Asbestos surveys in Caerphilly

Caerphilly

Asbestos surveys and ongoing asbestos management for organisations and property owners across Caerphilly.

Asbestos surveys in Pontypridd & Rhondda Cynon Taf

Pontypridd & Rhondda Cynon Taf

Home to our South Wales office in Treforest, supporting clients right across Rhondda Cynon Taf.

Asbestos surveys in Vale of Glamorgan

Vale of Glamorgan

Surveys and reinspections for schools, commercial premises, housing and homes across the Vale.

Asbestos surveys in Merthyr Tydfil

Merthyr Tydfil

Asbestos surveys and air monitoring for public-sector, commercial and residential properties in Merthyr Tydfil.

Asbestos surveys in Neath Port Talbot

Neath Port Talbot

Supporting industrial, commercial and residential sites across Neath, Port Talbot and the surrounding valleys.

R&D Survey FAQs

Common questions from contractors, developers and property owners planning works in South Wales.

When is a refurbishment and demolition survey required?

Before any refurbishment, renovation, building or demolition work is carried out on a building constructed before 2000. The survey covers the area where work is planned and must be completed before work starts.

Do I need an asbestos survey before refurbishment?

If the building was constructed before 2000 and the work will disturb the fabric of the building, yes – a refurbishment survey of the affected area is needed so that any asbestos can be identified and dealt with before work begins.

How is an R&D survey different from a management survey?

A management survey is far less intrusive and is used during normal occupation. An R&D survey is fully intrusive within the area of work and uses destructive techniques to locate asbestos that may be hidden in the fabric of the building.

Can refurbishment begin before the asbestos survey?

No. The survey should be completed before work starts, and sufficiently in advance in case asbestos is found that requires removal. The removal of certain asbestos-containing materials must be notified to the HSE 14 days before removal begins.

Who should carry out an R&D survey?

A surveyor holding the BOHS P402 as a minimum, and it is strongly recommended that a UKAS accredited company is appointed. Core is UKAS accredited to ISO/IEC 17020 for Refurbishment & Demolition Surveys.

Do you provide R&D surveys across South Wales?

Yes. We carry out refurbishment and demolition surveys throughout South Wales from our Treforest office, including Cardiff, Newport, Swansea, Bridgend and the surrounding areas.

What our Clients Say: